Engineering & Mining Journal

SEP 2017

Engineering and Mining Journal - Whether the market is copper, gold, nickel, iron ore, lead/zinc, PGM, diamonds or other commodities, E&MJ takes the lead in projecting trends, following development and reporting on the most efficient operating pr

Issue link: https://emj.epubxp.com/i/872627

Contents of this Issue

Navigation

Page 42 of 99

SEPTEMBER 2017 • E&MJ; 41 www.e-mj.com BLASTING Managing Boulders Typically the V-Cut will eject a sizeable triangular wedge shaped boulder out from the blast, which is usually found posi- tioned in the center of room well out from the face and often intact. The rest of the holes throw a well fragmented muckpile slightly forwards due to the angled nature of the majority of the holes. Two methods exist for management of boulders from the center of a V-Cut and are critical if the initial V will have holes spaced apart for prevention of precompression and dead- pressing. The fi rst newer and preferred method is the use of buster holes, which are paral- lel holes that are put into the fi rst V cut to partial depth. These holes are normally fi red on the fi rst delay and can each be delayed from one another if vibration is a concern, as they generally will have larger vibration based on scaled dis- tance (pound per delay) than a normal hole would. These buster holes will radially crack the center portion of the face to reduce the amount and size of boulders after the shot. The second and tra- ditional method to break these middle boulders is through the use of Baby V's, which tend to produce less vibration than the buster charges. The Baby V is a smaller V that is placed in the middle of the main V and does not extend to full depth, but is fi red before the main V. This Baby V will then break out an area in the face in front of the main V, removing boulders that would be created in that zone. The Baby V can also allow for a farther face advance and lower vibration levels when properly de- signed into the main round. However, this method involves more holes and delays than the former and as such is the more expensive and complicated option. These boulder-busting techniques can also be used with some advanced vibra- tion control techniques such as signature hole and sacrifi cial hole techniques, as described by (Lusk, et al., 2006) to sig- nifi cantly reduce vibration levels if blast- ing near structures. Figure 2—Modern V-Cut design (Worsey, 2015). Figure 3—V-Cut design at Springfi eld Underground, with Ikon logger assigned delays (Lusk, et al., 2006).

Articles in this issue

Links on this page

Archives of this issue

view archives of Engineering & Mining Journal - SEP 2017