Engineering & Mining Journal

JUL 2014

Engineering and Mining Journal - Whether the market is copper, gold, nickel, iron ore, lead/zinc, PGM, diamonds or other commodities, E&MJ takes the lead in projecting trends, following development and reporting on the most efficient operating pr

Issue link: https://emj.epubxp.com/i/342236

Contents of this Issue

Navigation

Page 84 of 99

JULY 2014 • E&MJ; 83 www.e-mj.com S U P P L I E R S R E P O R T unified objectives and metrics. Integrated Planning and Optimization Solution uses data analysis of contextual process infor- mation to improve predictive maintenance and identify and resolve bottlenecks. The developers noted that mining com- panies have been held back by the lack of standard solutions and realizable architec- tures. The implementation of an integrated planning and optimization solution re- solves these issues. Mining companies can start by focusing on areas that could gen- erate immediate benefit, including: • Lack of dynamic and optimized extrac- tion sequencing. • Lack of optimized load in shovels and other transportation means. • Poor process performance (quality, recovery). • Costly decisions due to unreliable data (such as inventory, grade, geological structure). • Nonconformance to load-out plans. • Excess energy and water consumption. • High cost of inefficient transport sched- uling and use. • Poor asset performance. • Maintenance and production conflicts. • Excess inventory due to an unreliable supply chain. Diego Areces, president of Schneider's Mining, Minerals and Metals Solution, said, "This solution is a game-changer for leaders in the mining industry by allowing executives to gain intelligence around business scenarios prior to committing to capital investments." Integrated Planning and Optimization Solution utilizes Schneider Electric's Hitachi recently announced that two of its EX5500-5 front shovels passed significant service-life milestones while working at the Yanacocha gold mine in Peru—each has racked up more than 100,000 operating hours. The occasion was marked by an on- site recognition event, pictured below. Both EX5500-5 machines—the prede- cessor to Hitachi's current EX5600-6 model—were delivered 14 years ago and have been working at numerous pits in the 251-km 2 surface mine ever since. Both machines achieved the 100,000-hour goal within three weeks of each other. Hitachi Shovels Pass 100K Operating Hours at Yanacocha EMJ_pg82-85_EMJ_pg82-85 7/1/14 11:58 AM Page 83

Articles in this issue

Links on this page

Archives of this issue

view archives of Engineering & Mining Journal - JUL 2014